Auger Systems

The economic microtunnelling solutions

mts Auger System is an economic microtunnelling solution for soft soil (sand, silt, clay) without boulders and with a very low groundwater level. It is suitable for small to medium diameters and short to medium jacking lengths. The excavated spoil is transported via Auger Train to the start shaft, a spoil treatment is not neccessary. The pipes are pushed in directly after the Cutter Head. The machine is easily operated from the Contol Container on the surface. Due to our laser based guidance system, a very high accuracy is reached.

mts1000A

• Pipe jacking
• Diameter: DN250mm - DN600mm
• Jacking length: Max. 120m
• Cutter Disc is driven by the auger train

mts2000A

• Pipe jacking
• Diameter: DN600mm - DN1600mm
• Jacking length: Max. 300m
• Cutter Disc is driven by motor in the Steering Head

Facts

  • Up to 300m jacking length
  • Economic & secure operation
  • Adaptable to slurry spoil transport

The economic solution up to medium diameters. Easily adaptable.

Job-site setup